Armourfix and armourvalley membranes must be installed and extended 60 90 cm up the main roof underneath the shingles in order to assure a waterproof connection.
Flat section flat roof to pitched roof junction detail.
Although flat roofs are cheaper to build than pitched roofs they have a shorter life span.
To discuss your project in more detail please contact your local area manager.
Fold to create hook 110 mm min.
Ridge flashing to cover all lower roof flashings.
Warm roof to pitched roof junction mansard.
Although the construction of the actual roof component of a parapet roof is almost identical to a typical pitched roof it is wise to use a greater minimum roof pitch than is recommended by the roof sheet.
A very important detail is where the flat roof is connecting the pitch roof.
Double glazed flushglaze with glass fins.
As well as the small selection of roof detail drawings shown here many of the building notes have a related construction detail drawing with specific dimensions eg rafter sizes spans insulations types for purchase with the building specifications.
The building roofing system is responsible for around 25 35 loss of energy within a building.
Additional construction details drawings.
Standard glass roof light cad drawing references for flat roofs flush box sliding smoke vent and access roof lights.
2 crests width to finish in next trough fold lines shown dotted angle 2 roof pitch fold lines shown dotted angle 2 roof pitch 2 crests width to finish in next trough fold to form kick out 130 200 mm but ridge flashing width fold to form kick out.
Pitched roof houses are 10 15 more compact compare to that of flat roofs.
Detail c section across fall.
Pitched flushglaze head detail.
A roof is considered to be flat when it is of a slope of 1 5 o to the horizontal.
The pitched roof provides higher thermal insulation by simply limiting the size of the surface exposed to the exterior.
Here are some new building regs drawings including mansard roof edge parapet wall box gutter verge detail pitched roof flat roof abutment threshold welted drip for external gutter pitched roof to wall junction timber frame timber clad eaves details window frame window lintel window sill manholes soakaway sanitary pipework basements etc.
The starter strip and first row of shingles must be applied 25 cm from the bottom of the slope roof or main roof above the slope transition.