Allow the water to remain at this depth for 24 72 hours to make sure that any drains returns or other penetrations are not leaking.
Flood test roof.
Flood testing will not provide useful information about the quality of the roof design or installation nor about the durability of the materials used.
Please feel free to consult with us if you require a flood test.
The roofing contractor will then if needed plug any drains in the area to make sure that water does not drain off the roof during this test.
Although flood testing can determine the existence of a leak it cannot precisely identify the location even with use of soluble dyes in the water.
For example roof drains are not designed to be leak free under hydrostatic pressure so it is highly likely they would leak at this location s flashing during a flood test.
Care must be taken when specifying flood testing eg.
Our roofing engineers can carry out flood testing on large and small surfaces so whether you want us to check a house office shopping centre or football stadium for roof or wall leaks we can meet your needs.
It may if the depth of water is sufficient indicate whether there is a breach in the membrane but it will not confirm the overall ability of the roof to provide satisfactory service throughout its expected service life.
Will the drainage system take the pressure of release.
To flood test begin filling the pool fountain or vessel with water at the rate of 1 25mm per hour to a depth of 2 to 4 50mm to 100mm.
Will the roof take the weight.
Flood testing works on is a diverse testing method and can be used on practically all roofing membranes and build ups providing you with solid visual representation.
Applies for fully adhered or bonded sheet membranes liquid or fluid.
Flood testing is the oldest simplest and basic method of testing a roofs integrity.
When the area to be tested has a slope greater than 1 4 per foot the depth of the water needed to test that area increases dramatically.
A membrane integrity test conducted by temporarily plugging or otherwise closing any drains and erecting temporary dams where required to retain water on the surface of a waterproofing membrane and then flooding the surface to a maximum depth of 2 inches at the high point.
Manufacturers should specify a minimum time period for materials to cure prior to performing flood test however no testing should be performed during the first 24 h following installation of system materials 48 h min if materials are installed at a time when ambient temperatures are below 10 c 50 f.
What are the effects of major water ingress.
Who monitors it overnight.
Difficulties with flood testing are the time required to fill test and then drain the sometimes tens of thousands of gallons of water required to properly test an area.